Situated in a newly developed urban area of Rivas Vaciamadrid, this sports and recreation complex spans a 41,000 m² plot, integrating seamlessly with its surroundings. The facility encompasses indoor and outdoor spaces, including activity rooms, fitness areas, swimming pools, and various sports courts. The design emphasizes energy efficiency and sustainability through the use of prefabricated materials, photovoltaic systems, and rainwater harvesting. The complex’s layout and proportions are carefully considered to ensure full accessibility and harmony with the urban context.
Supera Rivas Vaciamadrid Sports Center

The project is located in Rivas Vaciamadrid, Madrid, on a 41,000 m² plot within a newly developed urban area surrounded by public facilities such as schools and shopping centers. The facility was developed under a public concession agreement with a private client.

The program includes indoor and outdoor areas dedicated to sports and recreational activities. The main building features a public entrance plaza leading to a reception lobby. On the ground floor, there are changing rooms, multipurpose activity rooms, and an area housing indoor pools and a spa. The first floor includes a fitness room and additional spaces for guided activities. Technical facilities are located in the basement. Outdoor amenities complement the indoor program with paddle tennis courts, running tracks, football fields, various sports courts, outdoor swimming pools, and a solarium.

The construction utilizes prefabricated materials to enhance both energy efficiency and construction effectiveness. Sustainability measures include photovoltaic energy systems, micro-cogeneration, rainwater harvesting for irrigation, and high-performance insulation throughout the building envelope.

The complex is integrated into the urban fabric, offering a comprehensive sports program with full accessibility. Its proportions and layout have been carefully designed to harmonize with the surrounding urban environment.

Details
Owner: Supera Rivas S.L.
Purpose: Sport Center
Area: 41000sqm
Budget: € 13M
Status: Completed

Project Team
Architect: Antonio Desmonts Sierra
MEP Engenieer: Magaral ING.
Structural Engineer: Miguel Fdez. Juan Ferreiro
Images: Drama Studio